Product Roadmap

See what we are working on and what is coming next

Updated over a week ago

Product Roadmap

Latest Update: December 2023

Below are the primary Lyra Platform features and improvements that we are currently working on, those that are on the horizon, and those that we have recently released.

๐Ÿšง In progress

  • Short Circuit Current Rating (SCCR) requirements

  • Performance and stability enhancements

โ˜๏ธ Up next

  • Los Angeles County, CA fire requirements for ESS

  • Expanded ESS equipment and configuration options

๐ŸŽ‰ Completed

  • Tesla ESS partial home backup configuration

  • Support for QuickBolt QB2 mounting product

  • Support for Unirac Solarhooks mounting product

  • Third-party optimizers with string inverters (like Tigo TS4-A-O)

  • Enphase 3rd-generation system (IQ Battery 5P, IQ System Controller 3/3G, IQ Combiner 5/5C)

  • Display distances from buildings to the parcel boundary in the permit package

  • Trace parcel boundaries and display them in the permit package with dimensions

  • Three-line diagrams for supply-side interconnections at a meter collar (like the ConnectDER) and solar-ready main panels with an auxiliary input

  • Trace to scale custom base imagery

  • Improved leaders and callouts on the site placard to keep crossing lines to a minimum

  • Ability to view 3D roof face dimensions on canvas

  • Three-line diagrams for central string inverter systems

  • Ability to upload custom base imagery (like blueprints or drone images)

  • Support for NEC 2023

  • Three-line diagrams for Enphase systems with ESS
    Changes to permit package to accommodate interconnection application requirements of Xcel Energy utility company and its subsidiaries

  • Ability to reposition buildings on the canvas

  • Three-line diagrams for supply-side Enphase systems without ESS and SolarEdge systems

  • Ability to specify the Electric Service Identifier (ESID) of the property for projects located in Texas

  • MPPT parallel stringing to support inverters like Sol-Ark

  • Three-line diagrams for load-side Enphase systems without ESS

  • Three-line diagrams for load-side SolarEdge systems

  • Array layout design experience enhancements

  • Ability to use bifacial modules in designs and permit packages

  • Enphase ESS partial home backup and self-consumption configurations

  • Bill of materials in Excel spreadsheet format

  • Ability to create projects located in Puerto Rico

  • Support for EcoFasten ClickFit mounting system on composition shingle roofs

  • Support for NFPA 1 2021

  • Support for Oregon Fire Code (OFC) 2019

  • Support for ASCE 7-16 wind pressure zones

Evergreen Initiatives

When we are thinking about how to set priorities, there are a few initiatives that we feel are important to always keep near the top of the list.

AHJ/Utility acceptance

  • Maintaining compliance with all nationally-adopted codes and standards

  • Increasing support for localized permitting requirements

  • Increasing support for localized utility requirements

Support for top products

Support for products in the marketplace getting significant traction. We likely cannot support every product, so we prioritize products with more demand.

Ease of use

We are always looking for ways to improve everyone's experience

Future Priorities

These are items that are on our radar but are lower in priority due to demand.

  • Ground mounts

  • Full support for tilt-up mounting on flat roofs

  • Ballasted mounting

  • Shade analysis


Contact us

If you don't see an improvement or feature that you may need, please contact us to let us know your request.

Did this answer your question?